Skip to content

Daily Full Build Pipeline (master) #1199

Daily Full Build Pipeline (master)

Daily Full Build Pipeline (master) #1199

Triggered via schedule February 26, 2025 18:35
Status Failure
Total duration 2h 30m 23s
Artifacts
Build ballerina-lang
2h 30m
Build ballerina-lang
Build Standard Libraries & Tools
0s
Build Standard Libraries & Tools
Build ballerina-distribution
0s
Build ballerina-distribution
Build nBallerina
0s
Build nBallerina
Ubuntu rpm Installer
0s
Ubuntu rpm Installer
Build MacOS Installer
0s
Build MacOS Installer
Build MacOS ARM Installer
0s
Build MacOS ARM Installer
Build Windows Installer
0s
Build Windows Installer
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 2 warnings
Build ballerina-lang
The job running on runner GitHub Actions 50 has exceeded the maximum execution time of 150 minutes.
Build ballerina-lang
The operation was canceled.
Build ballerina-lang
Please remove "components: 'native-image'" from your workflow file. It is automatically included since GraalVM for JDK 17: https://github.com/oracle/graal/pull/5995
Build ballerina-lang
The process '/usr/bin/git' failed with exit code 128