fix: Erase the project before the import and refresh the ontology cac… #7557
build-and-test.yml
on: push
Check formatting
5m 35s
Matrix: Build and test
Matrix: Build and integration-test
Matrix: Test docs
Annotations
3 errors
Check formatting
Process completed with exit code 2.
|
Build and integration-test (21)
Canceling since a higher priority waiting request for 'refs/heads/fix/import-delete-resources-21-it' exists
|
Build and integration-test (21)
The operation was canceled.
|